Permit & Inspection Information


 

  1. No inspections will be made unless permit card is displayed and visible from the street, and stamped approved plans are readily available.

 

  1. The permit will become null and void if the work authorized does not have another approved inspection every one-hundred and eighty (180) days.

 

    3.    Partial inspections are available upon request but will not satisfy the criteria of extending the
           life  of  the permit. 

    4.    Mechanical, electrical and plumbing inspection approvals are required before building inspections.

 

  1. Certificate of Occupancy must be secured before this building can be used or inhabited for any purpose. 

 

  1. Do not remove building permit from job site until issuance of certificate of occupancy.

 

For inspections call or fax Marathon City Hall at the following number(s):

 

Phone: (305) 743-0033 extension 1 or (305) 289-4133   
Fax: (305) 743- 3667 Attention: Building Department

 

The following information for an inspection will be required:

 

  1. Date inspection requested                     
  2. Type of inspection.
  3. Project or Permit Number                        
  4. Name of the individual requesting the inspection
  5. Job site address.                                    
  6. Property owner’s name.               
  7. Name of contractor performing work along with a contact number

 

 

 

The following inspections Satisfy the 180-day requirement.

 

Building

Auger 
                     
Piling / Pile Caps

Grade Beam / slab

Columns / Tie Beam  

Slab / Wood Floor   

Stairs

Roof trusses / sheathing     

Framing  

Insulation

Drywall      


                    Roofing
                     Dry-in
                     Roofing in progress
                     Roofing final

 

Seawall/ dock

 

Footings

Auger tie back

Wall or cantilever

Deck

Davit bases

Final

 

Plumbing

Ground rough ( per floor)

Total rough (top out & water pipe)

Sewer connection

Potable Rough

DWV Rough

Plumbing final

Electrical

Slab Rough (per floor)

Ground Rough

Total Rough

Pool Bonding

Steel Bonding

Electric Final

Mechanical

A/C ductwork (per floor)

Rough mechanical

Tie Down

Mechanical Final   

Pools / Spas 
Pool Plumbing
Pool Bonding
Pool Steel / Anchoring
Pool Final